Melton Free-mo AU works update - 12-2-13
A very small update, showing the upgrade of the transition Free-mo AU module from single track to double track via a curved Peco point.
A LOT of scenery still to be completed, however, the addition of the second track should be more than welcome on the Free-mo AU Run Day (23/24 Feb '13) when Rebel and Melton FMAU visit the MMRC clubrooms.
Bus wiring runs through the transition module at the moment and now the tracks are finalised (again!) dropper wires will be installed Sat 16-2-13.